Harmonized Tariff Schedule of the U.S. › Chapter 68 Articles of stone, plaster, cement, asbestos, mica or similar materials
6810.11.00.10Tariff line
Classification path
Articles of cement, of concrete or of artificial stone, whether or not reinforced
6810
Tiles, flagstones, bricks and similar articles
Building blocks and bricks
Containing by weight more than 70 percent magnesia, expressed as MgO, with carbon content ranging from trace amounts to less than 30 percent, and chemically bonded by resin or pitch
6810.11.00.10
Rates of duty
General rate (Column 1)3.2%
SpecialFree (A, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM, P, PA, PE, S, SG)
Column 230%
Unitm2
Free (A, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM, P, PA, PE, S, SG)
Printed page 2456
Measure flags
for origin CN, entry date 2026-10-26 · base rate 3.2%
- Section 301 forced-labor tariff (12.5%)9903.05.31Applies+12.5%China: Column 1 rate + 12.5% additional
- China 301 List 3 (9903.88.03)9903.88.03Applies+25%8-digit subheading 6810.11.00 is on L3
- AD/CVD: 4 orders in placeConditional—Cash deposits follow the company-specific rate (ACE case module). Coverage depends on each order's scope. The table below lists case numbers, status and the all-others rate. The all-others deposit rate is counted in the maximum exposure, not in the confirmed total.
- AD/CVD 4 casesConditionalAD 326.15% + CVD 45.32% / AD 236% + CVD 3%A570084 / C570085; A570954 / C570955
Confirmed total 40.7% · max 412.17%Full duty breakdown →